تشينغداو هواشيدا الماكينات المحدودة

فيديوهات أخرى
May 28, 2025
Brief: Discover Qingdao Huashida Machinery Co., Ltd.'s advanced Three-Layer PE Spraying Equipment Steel Pipe Anti-Corrosion Production Line. This state-of-the-art system enhances pipe durability, mechanical strength, and electrical insulation, making it ideal for oil, gas, and water pipelines. Learn how our technology extends pipe lifespan from 5-10 years to 50-100 years.
Related Product Features:
  • Three-layer coating: Fusion-bonded epoxy powder (FBE), adhesive (AD), and polyethylene (PE) for superior protection.
  • Extends pipe lifespan from 5-10 years to 50-100 years, reducing maintenance costs.
  • High mechanical strength, excellent electrical insulation, and waterproof properties.
  • Suitable for harsh environments and corrosive conditions, ensuring long-term performance.
  • Comprehensive equipment setup including rust removal, coating, and cooling systems.
  • Meets international standards like SY/T0413-2002, GB/T23257-2009, and DIN 30670.
  • High production output: Max. 3-8 km/day, annual capacity of 2 million square meters.
  • Widely sold in countries including Russia, Iran, UAE, India, and Kazakhstan.
الأسئلة:
  • What is the pipe diameter range the equipment can handle?
    The equipment can handle pipe diameters ranging from Φ159 to Φ1220 mm.
  • What are the coating standards met by this production line?
    The production line meets multiple international standards, including SY/T0413-2002, GB/T23257-2009, and German DIN 30670.
  • What is the delivery time for the equipment?
    The delivery time is typically 2-3 months after the deposit is received.
  • What after-sales services are provided?
    We offer a 12-month warranty for mechanical parts and a 6-month warranty for electrical parts, along with technical support, training, and operator guidance.
فيديوهات ذات صلة

3lpe

3pe
June 07, 2024

آلة خط إنتاج سترة PE المعزولة مسبقاً

خط الأنابيب المعزول من قبل
December 11, 2024

الأكمام يتقلص الحرارة

الأكمام يتقلص الحرارة
March 15, 2024

خط طحن أنابيب بي إي معزولة مسبقاً 150 كيلوواط

خط الأنابيب المعزول من قبل
April 25, 2024

خط إنتاج الأنبوب/الورق العازل من الرغوة المطاطية

خط إنتاج الألواح العازلة من الرغوة المطاطية
January 04, 2024

شريط ضئيل الحرارة

الأكمام يتقلص الحرارة
January 09, 2025